November 19, 1998.
The siding has been hung and the cabinets and cupboards are installed (well, most of them anyway).
The master bath (and all other ceramic tile) has been laid/hung, including the jaccuzzi. Better photos will follow as soon as the painters uncover everything. | |
The kitchen with cabinets and cupboards. Still wrapped to protect from paint spray. | |
Rachel's shower is roughly 6.5'x5', which will make it easy (we hope) for an adult to shower her while standing. | |