November 19, 1998.
The siding has been hung and the cabinets and cupboards are installed (well, most of them anyway).
![]() | |
![]() | |
![]() | |
![]() | |
![]() | The master bath (and all other ceramic tile) has been laid/hung, including the jaccuzzi. Better photos will follow as soon as the painters uncover everything. |
![]() | The kitchen with cabinets and cupboards. Still wrapped to protect from paint spray. |
![]() | Rachel's shower is roughly 6.5'x5', which will make it easy (we hope) for an adult to shower her while standing. |