February 13, 1999.
The deck is under construction by Northern Deckworks. It should be finished in a couple weeks.
![]() | The deck is integrated with the side wheelchair ramp. |
![]() | |
![]() | The construction is all 6"x6" vertical supports with no bolts bearing the weight of the structure. I like it! |
![]() | The screened porch will cover the kitchen window. |
![]() | The stairs will lead down to an eventual patio outside the basement french door. |
![]() | A view back up the hill (to the south). |
![]() | This integrating ramp is steep, but still allows Rachel's wheelchair passage between the main ramp and the deck. |
![]() | There's still a little cleanup to do. |
![]() | Looks great! |
![]() | Details are what make this deck so wonderful. |
![]() | Every last detail was designed-in and implemented perfectly. The benches are cedar. |
![]() | The view coming around the corner from the ramp. |
![]() | This skylight is supposed to let a bit more light into the kitchen. Problem is, it faces north. Eileen thinks it might have worked better facing east. Maybe so. Too late now! |
![]() | I love the detail in the rafters. A ceiling fan/light will hang where the wires are. There will also be two spotlamps on the corners to light the stairs and the main area of the deck. |
![]() | The downspout and gutters are not yet done in this photo as can be seen here through the screen. |
![]() | View to the south. |
![]() | On the wheelchair ramp looking west toward Clovermeadow Drive. |
![]() | The ceiling fan and stereo speakers add the final touch. |
![]() | Not to mention this wonderful Shorea wood furniture. |