February 13, 1999.
The deck is under construction by Northern Deckworks. It should be finished in a couple weeks.
The deck is integrated with the side wheelchair ramp. | |
The construction is all 6"x6" vertical supports with no bolts bearing the weight of the structure. I like it! | |
The screened porch will cover the kitchen window. | |
The stairs will lead down to an eventual patio outside the basement french door. | |
A view back up the hill (to the south). | |
This integrating ramp is steep, but still allows Rachel's wheelchair passage between the main ramp and the deck. | |
There's still a little cleanup to do. | |
Looks great! | |
Details are what make this deck so wonderful. | |
Every last detail was designed-in and implemented perfectly. The benches are cedar. | |
The view coming around the corner from the ramp. | |
This skylight is supposed to let a bit more light into the kitchen. Problem is, it faces north. Eileen thinks it might have worked better facing east. Maybe so. Too late now! | |
I love the detail in the rafters. A ceiling fan/light will hang where the wires are. There will also be two spotlamps on the corners to light the stairs and the main area of the deck. | |
The downspout and gutters are not yet done in this photo as can be seen here through the screen. | |
View to the south. | |
On the wheelchair ramp looking west toward Clovermeadow Drive. | |
The ceiling fan and stereo speakers add the final touch. | |
Not to mention this wonderful Shorea wood furniture. |