February 13, 1999.
The deck is under construction by Northern Deckworks. It should be finished in a couple weeks.
| The deck is integrated with the side wheelchair ramp. |
| |
| The construction is all 6"x6" vertical supports with no bolts bearing the weight of the structure. I like it! |
| The screened porch will cover the kitchen window. |
| The stairs will lead down to an eventual patio outside the basement french door. |
| A view back up the hill (to the south). |
| This integrating ramp is steep, but still allows Rachel's wheelchair passage between the main ramp and the deck. |
| There's still a little cleanup to do. |
| Looks great! |
| Details are what make this deck so wonderful. |
| Every last detail was designed-in and implemented perfectly. The benches are cedar. |
| The view coming around the corner from the ramp. |
| This skylight is supposed to let a bit more light into the kitchen. Problem is, it faces north. Eileen thinks it might have worked better facing east. Maybe so. Too late now! |
| I love the detail in the rafters. A ceiling fan/light will hang where the wires are. There will also be two spotlamps on the corners to light the stairs and the main area of the deck. |
| The downspout and gutters are not yet done in this photo as can be seen here through the screen. |
| View to the south. |
| On the wheelchair ramp looking west toward Clovermeadow Drive. |
| The ceiling fan and stereo speakers add the final touch. |
| Not to mention this wonderful Shorea wood furniture. |